{"id":2070,"date":"2026-07-11T03:56:49","date_gmt":"2026-07-11T03:56:49","guid":{"rendered":"https:\/\/cmguide.org\/?p=2029"},"modified":"2026-07-11T13:30:03","modified_gmt":"2026-07-11T13:30:03","slug":"how-to-break-down-big-projects-into-manageable-work","status":"publish","type":"post","link":"https:\/\/cmguide.org\/?p=2070","title":{"rendered":"How to Break Down Big Projects Into Manageable Work"},"content":{"rendered":"<p>Large projects rarely fail because the people involved weren&#8217;t capable. They far more often fail because the project was never properly broken down into pieces small enough to plan, estimate, and manage with any real accuracy. A vague, high-level goal \u2014 &#8220;launch the new product,&#8221; &#8220;redesign the process,&#8221; &#8220;deliver the campaign&#8221; \u2014 sounds clear enough in a planning meeting, but it&#8217;s nowhere near specific enough to build a realistic timeline, assign clear ownership, or estimate a genuine cost.<\/p>\n<p>This is exactly the gap a work breakdown structure is built to close, and despite the somewhat technical-sounding name, the underlying idea is simple enough to apply to almost any project, in any field.<\/p>\n<h2>What a Work Breakdown Structure Actually Is<\/h2>\n<p>A work breakdown structure is a way of decomposing a project into progressively smaller, more concrete pieces \u2014 from the overall goal, down through major phases or deliverables, down further into specific tasks and subtasks, until each piece is small and clear enough that someone could reasonably estimate how long it will take, what it will cost, and who should own it.<\/p>\n<p>It&#8217;s a foundational planning tool precisely because so much of what happens later in a project \u2014 the schedule, the budget, the resourcing \u2014 depends on having broken the work down accurately in the first place. Attempting to schedule or budget a vague, unbroken project is a bit like trying to estimate the cost of &#8220;a house&#8221; without knowing whether it&#8217;s a small cottage or a large custom build \u2014 the number is essentially meaningless until the work has been broken into pieces specific enough to actually estimate.<\/p>\n<h2>Why This Step Gets Skipped, and Why That&#8217;s a Mistake<\/h2>\n<p>Under time pressure, it&#8217;s tempting to skip straight from a high-level goal to a rough schedule, reasoning that the details can be worked out as the project progresses. This shortcut often feels efficient in the moment and reliably costs more time later \u2014 a plan built on an inadequately broken-down project tends to be optimistic in exactly the ways that later cause deadlines to slip and budgets to run over, because entire pieces of necessary work simply weren&#8217;t visible at the planning stage.<\/p>\n<h2>How to Build a Practical Breakdown<\/h2>\n<p><strong>Start with the overall deliverable, and decompose it into major components.<\/strong> What are the main pieces this project actually consists of? For a product launch, that might be development, marketing, logistics, and training. For a process redesign, it might be current-state analysis, future-state design, testing, and rollout.<\/p>\n<p><strong>Break each major component down further, until the pieces are genuinely manageable.<\/strong> Continue decomposing until each piece is specific and small enough that a single person or small team could reasonably estimate its time, cost, and requirements \u2014 a rule of thumb worth applying at each level is asking whether the current piece is still too vague to plan confidently, and if so, breaking it down further.<\/p>\n<p><strong>Assign clear ownership to each piece.<\/strong> A breakdown that isn&#8217;t tied to specific, accountable owners doesn&#8217;t actually help much in practice \u2014 every piece of work needs someone whose job it is to see it through.<\/p>\n<p><strong>Use the breakdown to build your schedule and budget, not the other way around.<\/strong> The estimate for each individual piece, built bottom-up from the breakdown, produces a far more realistic overall timeline and cost than a top-down guess about the whole project made before the work was actually decomposed.<\/p>\n<p><strong>Involve people with relevant experience in building the breakdown, not just the project lead alone.<\/strong> A breakdown built by a single person, however experienced, is more likely to miss important pieces than one built with input from people who&#8217;ve actually done similar work before \u2014 collective judgement consistently outperforms individual judgement in this specific exercise.<\/p>\n<p><strong>Revisit the breakdown as the project progresses.<\/strong> New information often reveals pieces of work that weren&#8217;t visible at the outset, or reveals that an original piece was actually more complex than initially assumed. Treating the breakdown as a living document, rather than a fixed artefact from day one, keeps the plan honest as the project unfolds.<\/p>\n<h2>What Feeds Into a Good Breakdown<\/h2>\n<p>Building a genuinely useful breakdown works best with a few specific inputs already in place: a clear statement of what&#8217;s actually being approved and why, a general overview of the project&#8217;s scope and objectives, an understanding of the quality standards the work needs to meet, a sense of the overall approach being taken, and a clear-eyed view of the actual business case driving the project. Without reasonable clarity on these, a breakdown risks being detailed but ultimately disconnected from what the project is actually meant to achieve.<\/p>\n<h2>A Practical Scenario<\/h2>\n<p>A team is asked to &#8220;improve the customer onboarding experience&#8221; \u2014 a clear enough goal in a leadership meeting, but not remotely specific enough to plan or resource. Rather than guessing at a timeline immediately, the project lead spends a day working through a breakdown with two colleagues who&#8217;ve run similar initiatives before: research into current pain points, redesign of the onboarding flow, technical implementation, content and messaging updates, staff training, and a phased rollout with monitoring.<\/p>\n<p>Each of those pieces gets broken down further into specific, estimable tasks. The resulting bottom-up timeline turns out to be considerably longer than the vague, top-down estimate that had been informally floated earlier \u2014 not because the team is slower than expected, but because the earlier estimate had never actually accounted for several pieces of necessary work that only became visible once the project was properly decomposed. Surfacing that gap early, before commitments were made publicly, avoids a much more painful conversation later.<\/p>\n<h2>Common Mistakes<\/h2>\n<p><strong>Stopping the breakdown too early.<\/strong> Pieces that are still too vague to estimate confidently need further decomposition \u2014 stopping at &#8220;marketing&#8221; or &#8220;development&#8221; without breaking those down further leaves too much ambiguity for realistic planning.<\/p>\n<p><strong>Building the breakdown alone.<\/strong> A single person&#8217;s breakdown, however experienced, is more likely to miss important pieces than one built with input from others who&#8217;ve done similar work.<\/p>\n<p><strong>Estimating the whole project before breaking it down.<\/strong> A top-down guess made before decomposition tends to be optimistic in ways a bottom-up, piece-by-piece estimate usually isn&#8217;t.<\/p>\n<p><strong>Treating the breakdown as fixed once created.<\/strong> New information during the project often reveals gaps in the original breakdown \u2014 failing to revisit it lets the plan drift out of sync with reality.<\/p>\n<h2>Action Steps<\/h2>\n<ol>\n<li>For your next significant project, resist the urge to estimate a timeline before breaking the work down into specific, manageable pieces.<\/li>\n<li>Involve at least one other person with relevant experience when building your breakdown, rather than doing it alone.<\/li>\n<li>For each piece in your breakdown, check whether it&#8217;s specific enough to estimate confidently \u2014 if not, break it down further.<\/li>\n<li>Assign clear, individual ownership to each piece of the breakdown, not just the project as a whole.<\/li>\n<li>Set a point partway through the project to revisit and update the breakdown as new information emerges.<\/li>\n<\/ol>\n<h2>Key Takeaways<\/h2>\n<ul>\n<li>Many project failures trace back to inadequate breakdown at the planning stage, not poor execution later on.<\/li>\n<li>A work breakdown structure decomposes a vague goal into pieces specific enough to estimate, assign, and manage realistically.<\/li>\n<li>Building the schedule and budget bottom-up from the breakdown produces more realistic plans than a top-down guess.<\/li>\n<li>Involving others with relevant experience in the breakdown process catches gaps that a single person is likely to miss.<\/li>\n<li>The breakdown should be revisited as the project progresses, not treated as fixed from the outset.<\/li>\n<\/ul>\n<h2>Conclusion<\/h2>\n<p>A work breakdown structure sounds like a technical, specialist tool, but the underlying discipline \u2014 decomposing a vague goal into pieces small and specific enough to actually plan \u2014 is one of the more broadly useful habits available to anyone managing meaningful work, technical or otherwise. Skipping this step in favour of a faster, top-down guess almost always costs more time later than it saves upfront. Doing it properly, with input from others and a willingness to revisit it as you learn more, is one of the highest-leverage habits in project planning.<\/p>\n<h2>Frequently Asked Questions<\/h2>\n<p><strong>Is a work breakdown structure only useful for large, formal projects?<\/strong><br \/>\nNo \u2014 the underlying principle, decomposing a vague goal into specific, estimable pieces, is useful for projects of almost any size, even if the formality of the exercise scales down for smaller efforts.<\/p>\n<p><strong>How detailed should a work breakdown structure be?<\/strong><br \/>\nDetailed enough that each piece is specific enough to estimate confidently and assign to a clear owner \u2014 if a piece still feels too vague to plan around, it likely needs further breakdown.<\/p>\n<p><strong>Who should be involved in creating a work breakdown structure?<\/strong><br \/>\nIdeally the project lead along with people who have relevant experience with similar work \u2014 a breakdown built by a single person is more likely to miss important pieces.<\/p>\n<p><strong>Should the breakdown be created before or after estimating the project timeline?<\/strong><br \/>\nBefore \u2014 a breakdown-first approach produces a bottom-up estimate that&#8217;s generally far more accurate than a top-down guess made before the work has been decomposed.<\/p>\n<p><strong>What&#8217;s the biggest risk of skipping this step?<\/strong><br \/>\nCommitting to a timeline or budget based on an inadequately understood scope, which tends to surface later as missed deadlines and cost overruns once the true extent of the work becomes visible.<\/p>\n<p><strong>Can a work breakdown structure change significantly once a project is underway?<\/strong><br \/>\nYes, and it often should \u2014 new information frequently reveals pieces of work that weren&#8217;t visible at the outset, and treating the breakdown as a living document keeps planning honest as the project evolves.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Most project failures trace back to a plan that never broke the work down properly in the first place. Here&#8217;s a practical, non-technical guide to doing it well.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[19],"tags":[20,15,43],"class_list":["post-2070","post","type-post","status-publish","format-standard","hentry","category-management-skills","tag-management-skills","tag-productivity","tag-project-management"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to Break Down Big Projects Into Manageable Work<\/title>\n<meta name=\"description\" content=\"Big projects fail more often from poor breakdown than from poor execution. Here&#039;s a practical guide to work breakdown structures, for any kind of project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cmguide.org\/?p=2070\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Break Down Big Projects Into Manageable Work\" \/>\n<meta property=\"og:description\" content=\"Big projects fail more often from poor breakdown than from poor execution. Here&#039;s a practical guide to work breakdown structures, for any kind of project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cmguide.org\/?p=2070\" \/>\n<meta property=\"og:site_name\" content=\"Career &amp; Management Guide\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-11T03:56:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-11T13:30:03+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/?p=2070#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/?p=2070\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/#\\\/schema\\\/person\\\/f995fc54a214c5601f122488210552dd\"},\"headline\":\"How to Break Down Big Projects Into Manageable Work\",\"datePublished\":\"2026-07-11T03:56:49+00:00\",\"dateModified\":\"2026-07-11T13:30:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/?p=2070\"},\"wordCount\":1594,\"publisher\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/#organization\"},\"keywords\":[\"management skills\",\"productivity\",\"project management\"],\"articleSection\":[\"Management Skills\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/?p=2070\",\"url\":\"https:\\\/\\\/cmguide.org\\\/?p=2070\",\"name\":\"How to Break Down Big Projects Into Manageable Work\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/#website\"},\"datePublished\":\"2026-07-11T03:56:49+00:00\",\"dateModified\":\"2026-07-11T13:30:03+00:00\",\"description\":\"Big projects fail more often from poor breakdown than from poor execution. Here's a practical guide to work breakdown structures, for any kind of project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/?p=2070#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/cmguide.org\\\/?p=2070\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/?p=2070#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/cmguide.org\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to Break Down Big Projects Into Manageable Work\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/#website\",\"url\":\"https:\\\/\\\/cmguide.org\\\/\",\"name\":\"Career & Management Guide\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/cmguide.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/#organization\",\"name\":\"Career & Management Guide\",\"url\":\"https:\\\/\\\/cmguide.org\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/cmguide.org\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/cmguide-logo.jpg\",\"contentUrl\":\"https:\\\/\\\/cmguide.org\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/cmguide-logo.jpg\",\"width\":289,\"height\":319,\"caption\":\"Career & Management Guide\"},\"image\":{\"@id\":\"https:\\\/\\\/cmguide.org\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/cmguide.org\\\/#\\\/schema\\\/person\\\/f995fc54a214c5601f122488210552dd\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8c554a309eaafbcfa1f6eb563278be3e6ebf9ce295465af440cffedca8be4dfd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8c554a309eaafbcfa1f6eb563278be3e6ebf9ce295465af440cffedca8be4dfd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8c554a309eaafbcfa1f6eb563278be3e6ebf9ce295465af440cffedca8be4dfd?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/cmguide.org\"],\"url\":\"https:\\\/\\\/cmguide.org\\\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Break Down Big Projects Into Manageable Work","description":"Big projects fail more often from poor breakdown than from poor execution. Here's a practical guide to work breakdown structures, for any kind of project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cmguide.org\/?p=2070","og_locale":"en_US","og_type":"article","og_title":"How to Break Down Big Projects Into Manageable Work","og_description":"Big projects fail more often from poor breakdown than from poor execution. Here's a practical guide to work breakdown structures, for any kind of project.","og_url":"https:\/\/cmguide.org\/?p=2070","og_site_name":"Career &amp; Management Guide","article_published_time":"2026-07-11T03:56:49+00:00","article_modified_time":"2026-07-11T13:30:03+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cmguide.org\/?p=2070#article","isPartOf":{"@id":"https:\/\/cmguide.org\/?p=2070"},"author":{"name":"admin","@id":"https:\/\/cmguide.org\/#\/schema\/person\/f995fc54a214c5601f122488210552dd"},"headline":"How to Break Down Big Projects Into Manageable Work","datePublished":"2026-07-11T03:56:49+00:00","dateModified":"2026-07-11T13:30:03+00:00","mainEntityOfPage":{"@id":"https:\/\/cmguide.org\/?p=2070"},"wordCount":1594,"publisher":{"@id":"https:\/\/cmguide.org\/#organization"},"keywords":["management skills","productivity","project management"],"articleSection":["Management Skills"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/cmguide.org\/?p=2070","url":"https:\/\/cmguide.org\/?p=2070","name":"How to Break Down Big Projects Into Manageable Work","isPartOf":{"@id":"https:\/\/cmguide.org\/#website"},"datePublished":"2026-07-11T03:56:49+00:00","dateModified":"2026-07-11T13:30:03+00:00","description":"Big projects fail more often from poor breakdown than from poor execution. Here's a practical guide to work breakdown structures, for any kind of project.","breadcrumb":{"@id":"https:\/\/cmguide.org\/?p=2070#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cmguide.org\/?p=2070"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/cmguide.org\/?p=2070#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cmguide.org\/"},{"@type":"ListItem","position":2,"name":"How to Break Down Big Projects Into Manageable Work"}]},{"@type":"WebSite","@id":"https:\/\/cmguide.org\/#website","url":"https:\/\/cmguide.org\/","name":"Career & Management Guide","description":"","publisher":{"@id":"https:\/\/cmguide.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cmguide.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cmguide.org\/#organization","name":"Career & Management Guide","url":"https:\/\/cmguide.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cmguide.org\/#\/schema\/logo\/image\/","url":"https:\/\/cmguide.org\/wp-content\/uploads\/2026\/07\/cmguide-logo.jpg","contentUrl":"https:\/\/cmguide.org\/wp-content\/uploads\/2026\/07\/cmguide-logo.jpg","width":289,"height":319,"caption":"Career & Management Guide"},"image":{"@id":"https:\/\/cmguide.org\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cmguide.org\/#\/schema\/person\/f995fc54a214c5601f122488210552dd","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8c554a309eaafbcfa1f6eb563278be3e6ebf9ce295465af440cffedca8be4dfd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8c554a309eaafbcfa1f6eb563278be3e6ebf9ce295465af440cffedca8be4dfd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8c554a309eaafbcfa1f6eb563278be3e6ebf9ce295465af440cffedca8be4dfd?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/cmguide.org"],"url":"https:\/\/cmguide.org\/?author=1"}]}},"jetpack_featured_media_url":"","_links":{"self":[{"href":"https:\/\/cmguide.org\/index.php?rest_route=\/wp\/v2\/posts\/2070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cmguide.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cmguide.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cmguide.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cmguide.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2070"}],"version-history":[{"count":2,"href":"https:\/\/cmguide.org\/index.php?rest_route=\/wp\/v2\/posts\/2070\/revisions"}],"predecessor-version":[{"id":2197,"href":"https:\/\/cmguide.org\/index.php?rest_route=\/wp\/v2\/posts\/2070\/revisions\/2197"}],"wp:attachment":[{"href":"https:\/\/cmguide.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cmguide.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cmguide.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}